Facade Design and Build
Design Phase
- Review of Building Design
- Identify Key area of concern
- Engineering concept design respect to arch. Intent.
- Concept and Schematic Design
- Material specification
- Structural Considerations
- BMU
- DBR
Post Tender Phase
- Tender Document
- COST BOQ
- Shop drawings
- Material specifications
- Fabrication drawing
- MTO
Installation and Handover
- Evaluation of Device as per specified in Tender
- Review device installation as per drawing
- Photograph equipment
- Document onsite hazards
- Recommendation and Remarks if so required
We’re Here To Help You
Through Creative Ideas, Innovation & Sheer Determination